Several days ago Sv. Duje was launched from the shipyard, and m/v Leopard sailed in. After Marjesco left the dock, her place was taken by m/v Leopard. It is the property of the Danish shipper Nordane Shipping. It is 67 m long, 19.20 m wide and constructed in 1989 in Denmark.
It is expected that docking and repair work on the hull, on the engine and the storage lids will last for two weeks.
The work on the second Danish ship, SDK Spain, are nearing its end.